同城叫小妹_全国同城空降快餐_全国同城空降快餐群最新活动_全国空降少女视频

上海金泰工程机械有限公司
上海安亭洛浦路45号 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130

 

主站蜘蛛池模板: 阿拉善右旗| 浠水县| 桦甸市| 大渡口区| 太仆寺旗| 确山县| 鸡西市| 栖霞市| 平和县| 依安县| 陆河县| 青州市| 井陉县| 沅江市| 甘洛县| 滨海县| 晋江市| 清新县| 恩施市| 黄大仙区| 游戏| 潮安县| 侯马市| 华蓥市| 沙坪坝区| 铜陵市| 临猗县| 潮安县| 盐源县| 武乡县| 资源县| 正镶白旗| 庆云县| 苏尼特右旗| 建始县| 额济纳旗| 浮梁县| 德江县| 辽阳市| 铜鼓县| 望江县|