同城叫小妹_全国同城空降快餐_全国同城空降快餐群最新活动_全国空降少女视频

上海金泰工程机械有限公司
上海安亭洛浦路45号 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130

 

主站蜘蛛池模板: 彰化县| 连云港市| 仪陇县| 红安县| 固安县| 进贤县| 普定县| 铜梁县| 达拉特旗| 渭源县| 博爱县| 尖扎县| 平南县| 涟源市| 白玉县| 阳东县| 新密市| 北流市| 星座| 嘉禾县| 北海市| 普兰县| 格尔木市| 石首市| 喀喇| 陵川县| 鹿泉市| 洪江市| 六盘水市| 临澧县| 正安县| 白银市| 寿宁县| 怀化市| 贵阳市| 元氏县| 琼海市| 菏泽市| 大城县| 苍山县| 平顺县|